Kamyeklaf · Guides
Guides
Practical guides written for the engineer in the engineering office and the contracting company: how to take off, how to price, and what construction really costs. Every guide cites its references and their dates, and separates assumptions from published figures.
Quantity take-off from drawings step by stepThe right order from foundations to paint, the unit of every item, the deduction rules, and a worked example with a measurement record.Quantity take-off
Best quantity take-off software in Saudi Arabia 2026: a practical comparisonEight programs and platforms on five criteria from their official websites: DWG reading, where the work lives, Arabic, prices in riyals, trial.Choosing software
BOQ pricing: unit-rate analysis step by stepThe five layers of an item price, a complete example for one cubic metre of reinforced concrete at published 2026 prices, and recurring pricing mistakes.Pricing
Contractor quotation template with a bill of quantities: what it must contain, and a ready templateThe quotation header, the priced bill of quantities and the footer with its terms, with a free Excel template and a checklist before sending.The quote
The difference between quantity take-off, bill of quantities, priced estimate and site measurementFour terms, one meaning each with its English equivalent, its place in the project cycle, and an example that passes through all of them.Terminology
The ten costliest quantity take-off mistakes in villa projects, and how to review a bill of quantities before approving itTen mistakes that recur in villa take-offs, how each is caught at review, and a ten-minute checklist.Reviewing a take-off
Quantity take-off directly from a DWG file: why quantities get lost in conversion to PDF and how to avoid itWhat DWG carries that PDF does not, where quantities get lost in conversion, when PDF is enough and how to calibrate it.DWG files
On-device quantity take-off versus cloud take-off: where do your drawings stay?What is uploaded, where it is stored, when it is deleted and who owns the project in both models, plus five questions to ask any provider.Drawing confidentiality
How a small engineering office delivers a quotation in one day: a workflow from the drawing to the offerAn hour-by-hour workflow from receiving the drawing in the morning to a priced quotation before the end of the day, and what is prepared once beforehand.Workflow
How much does it cost to build a villa in Riyadh in 2026?Figures per metre and per level for areas of 300 to 600 m², shell and finishing, from the calculator engine and published Saudi references.Cost
How much does shell construction cost in Riyadh in 2026?The shell price per metre for areas of 200 to 1,000 m², and what it includes and excludes.Cost
The same thing on screen
What these guides explain by hand is done by KAM Estimator desktop app in the published release 0.15.224 on the drawing and the bill of quantities directly, with a calculation basis for every item. Video tutorials show the path step by step.
This guide was published on . The prices mentioned are examples from published references with their dates, not a quotation.
