How a small engineering office delivers a quotation in one day: a workflow from the drawing to the offer
A villa quotation from the drawing to a PDF file with your logo in one working day is possible if the day is divided into six stages with a set time for each: an hour to receive and inspect the file, an hour and a half for on-screen take-off, two hours for review, two hours for pricing from a saved catalogue, an hour for the offer and the final check, and half an hour in reserve. The condition that cannot be dispensed with: a price catalogue ready before the drawing arrives, and a measurement record that makes the review possible in two hours rather than two days. The take-off figures in this guide come from published tests of a twin villa of 7 sheets that produced 131 items in 31 minutes of program time; everything else is estimated engineer time.
Why the single day matters
The owner who asks for three offers usually chooses between the first two that arrive with enough detail, and the third is read for comparison only. The office that delivers after a week finds the owner has already negotiated with someone else. The single day is not haste at the expense of accuracy, but an arrangement of the work so that no time is wasted on what can be prepared in advance.
Before the drawing arrives: what is prepared once
The day does not start from zero. Three things are built once and updated periodically:
- A catalogue of item prices with complete unit prices (materials, labour, equipment, overheads and profit) for the usual work sections in villas, with the date and source of every price. Detailed in the unit-rate analysis guide.
- A quotation template with a fixed header (office details, registration and tax number) and a fixed footer (inclusions, exclusions and terms), so that on the day only what concerns the project is written. Its elements are in the quotation template guide.
- A fixed checklist for receipt and review, like the one in this guide.
Without these three the day turns into three days whatever the tool.
The day by the hour
Hour 1 (8:00–9:00): receipt and inspection
- Open the file and count the sheets: plans, sections, elevations, stair details, aluminium schedule, structural if present.
- Identify the format: DWG is more accurate and faster, and PDF needs scale calibration on every sheet before any measurement, as in the guide to take-off directly from DWG.
- Write down what is missing and send the owner one consolidated question (a missing sheet, foundation level, the finish level required). Do not wait for the reply; record the assumption and carry on.
- Define the scope of the offer: shell, shell and finishing, or turnkey. The scope defines which work sections will be taken off.
Output of the hour: an inspected file, a written list of assumptions, a defined scope.
Hours 2 and 3 (9:00–10:30): on-screen take-off
Here the sheets are measured and the quantities extracted. In a published test of a twin villa of 7 architectural sheets, KAM Estimator produced 131 items in 31 minutes over three stages, including the flooring areas of 41 rooms with a −2.5% difference from the reference manual take-off, stair treads and risers in linear metres, and aluminium components linked to their schedule on the sheet. The time counted here is an hour and a half rather than half an hour, because the engineer needs time to select the sheets, read the cost before starting, and add what they want to measure by hand.
In a fully manual take-off the same stage for a villa of this size takes one to two days, and that is the difference that makes the single day possible or impossible.
Output of the stage: an unpriced bill of quantities, every item with its sheet, position and calculation basis.
Hours 4 and 5 (10:30–12:30): review
The review takes longer than the take-off, and that is right, not wrong. The app flags the items where its two readings disagreed or that were counted visually with "Review", so the engineer starts with them, then goes through the ten-point checklist in the guide to take-off mistakes: scale, units, one room by hand, duplication, waste, stairs and aluminium, forgotten items, printed schedules, measurement record, and the rate per square metre.
Then the items that do not appear on the architectural sheets are added: earthworks, formwork, insulation, temporary works, waste removal. These are taken from the fixed list of work sections, not from memory.
Output of the stage: A bill of quantities approved by the engineer, every item in it either "Confirmed" or reviewed.
Hours 6 and 7 (13:30–15:30): pricing
With the "Hand over to pricing" button the bill moves with its quantities to the pricing path. There every item is priced from your saved catalogue first, and what is not in it is priced from your imported suppliers' offers or from Saudi market prices with their sources, and the source is recorded with every price. Items that cannot be priced on the day (for example an item with an unusual specification awaiting a supplier's offer) are left "not priced" and listed under exclusions instead of being deleted.
Two hours are enough for a villa if the catalogue covers 80% of the items. If it covers less, the problem is in the catalogue, not the day, and it is solved by updating it after this project.
Output of the stage: A bill fully priced or priced with exclusions, with cost and profit visible to you alone.
Hour 8 (15:30–16:30): the offer and the final check
The quotation is produced as PDF and Excel with the office logo, with unit prices and totals only, without cost and profit. Then three things are checked before sending:
- The header: the quotation number, its date and validity (15 to 30 days), submitted to, and the project name.
- The footer: inclusions and exclusions, including every assumption recorded in the first hour and every item left unpriced.
- The three lines: the total before tax, VAT at 15% on a separate line, and the total after it.
Output of the stage: A sent offer, and a saved copy with its version so any later amendment can be compared against it.
The last half hour: reserve
For the owner's reply to the morning question if it arrives, or for re-pricing an item that changed, or for updating the catalogue with what you learned today.
The day in one table
| Time | Stage | Duration | Result |
|---|---|---|---|
| 8:00 | Receipt and inspection | 1 h | Assumptions and scope |
| 9:00 | On-screen take-off | 1.5 h | A bill of quantities with a calculation basis for every item |
| 10:30 | Review | 2 h | An approved bill |
| 13:30 | Pricing from the catalogue | 2 h | A priced bill |
| 15:30 | Offer and final check | 1 h | A PDF/Excel offer sent |
| 16:30 | Reserve | 0.5 h | An updated catalogue |
Eight hours, of which 31 minutes are documented program time and the rest estimated engineer time that varies with experience, the size of the villa and the completeness of its sheets.
What ruins the day
- An incomplete or outdated catalogue: turns the two pricing hours into a day of calls to suppliers.
- A PDF without scale calibration: ruins all the quantities and is discovered only at review, if at all.
- Waiting for the owner's reply: record the assumption and carry on, and put it under exclusions.
- A review without a measurement record: if every item does not have a calculation basis, the review is a re-measurement.
- Changing the scope mid-day: fix the scope in the first hour, and any extension is priced as a supplementary offer.
What differs for the contractor and the engineering office
The contractor goes through all six stages because they start from the drawing. The engineering office that receives the bill of quantities ready from the designer starts directly at the sixth hour: it imports the bill from Excel or reads it from PDF as printed, prices it and produces the offer, so the day is done in half. In both cases the project and the catalogue stay on the office computer.
Details of the two paths and the figures of the three published tests (twin villa, electrical bill, retail store) are on the engineering offices page.
FAQ
Start your first day
The single day is possible when the tools are ready before the drawing arrives: a price catalogue, a quotation template, and one path from the sheet to the offer. Start with a project whose quantities you know.