Kamyeklaf

Kamyeklaf · for engineers, engineering offices and contractors

Quantity take-off and BOQ pricing software for engineering offices and contractors

A desktop program with two paths: Takeoff reads the drawings and produces a bill of quantities in which every item carries its calculation basis and its position on the sheet, and Pricing reads the bill of quantities and prepares a quotation with your company logo. AI take-off that checks itself and flags what needs review. Your data stays encrypted on your computer, and the uploaded file is deleted from the server once the job is done. Some offices call it quantity surveying, estimating or measurement, and the bill of quantities a BOQ.

Every feature for 14 days · 150 points · no card · then free forever

Two paths in one program

You choose the path on the start screen, and each path has its own menu and projects. A contractor starts from the drawings and hands the project over to pricing with one button; an engineering office starts directly from the bill of quantities.

Path one · Takeoff

From the drawings to the bill of quantities

  • Opens PDF, DWG and DXF directly, without an external tool, with the sheets as printed and at their true scale, and accepts IFC and images
  • AI reading in stages, with the maximum number of points shown before a single point is charged
  • Every item carries its calculation basis and its position marked on the sheet itself
  • Manual takeoff by drawing on the plan for whatever you want to measure yourself
  • Export of the bill of quantities to Excel, and a PDF with the items marked on the sheets

Then the “Hand over to pricing” button moves the project, with its quantities, to the second path.

Path two · Pricing

From the bill of quantities to the quotation

  • Imports the bill of quantities from new and old Excel files (xlsx and xls)
  • Reads a PDF bill of quantities with AI exactly as printed, with code, description, unit and quantity, at a quarter point per page
  • Pricing from your own price catalogue on your computer, from your suppliers’ quotes imported from PDF and images, or from Saudi market prices with their sources
  • Drag, sort, copy and delete with undo in the bill of quantities
  • A PDF and Excel quotation with your logo, without showing cost and margin

An engineering office that receives the bill of quantities ready-made works here alone.

Figures from documented tests, not promises

Three real files went through the program in November 2026 and were compared with a manual takeoff or with the original file. These are internal test results, not a guarantee; every item in the result carries its calculation basis so you can verify it yourself.

Twin villa · 7 architectural sheets

−2.5%

Difference in the floor areas of 41 rooms from the reference manual takeoff (319.6 m² against 328).

  • 131 items in 31 minutes over three stages
  • Plans, sections, elevations, stair details and aluminium details
  • Stair treads and risers in linear metres, and components linked to the aluminium schedule
  • About 116 points from the balance
Electrical bill of quantities · PDF exported from Excel

57 / 57

Every item was read with the correct quantity, unit and code, from a file whose Arabic letters came out as broken symbols in text extraction.

  • 8 pages, 80 rows: 57 items, 11 headings and one total
  • Literal transcription as printed, and totals are not counted as items
  • A quarter point per page
Retail shop · 14 construction sheets

22 minutes

From uploading the file to 102 items ready for review over four stages, including the display units and their details.

  • Floor, ceiling, electrical and furniture plans, then the unit detail sheets
  • The components of each unit linked to it and to its count on the plan
  • About 111 points from the balance

What an item looks like in the result

Four items as they came out of the twin-villa test. The last column is what sets the program apart: where the number came from.

ItemQuantityStatusCalculation basis as written by the program
Master bedroom floor finish13.00 m²Confirmeddims: 4000x3250; internal dimensions 4.000×3.250 = 13.00 m², matching the printed area. Established by two independent readings.
Stair riser cladding, ground to first floor22.00 lmCalculatedIn linear metres: 22 steps × 1.00 m = 22 lm; the steps are numbered 1 to 22 on the detail sheet, and the level difference is 3.80 m.
Perimeter frame of the terrace door (ALUM-14)8.84 lmCalculatedPerimeter from the printed dimensions 2×(1.00+3.42) = 8.84 lm; unit ALUM-14 from the aluminium schedule on sheet 5.
Door with STC 30 acoustic rating10 no.ReviewVisual count of the door rating circles: ground 2, first 6, second 2. Shown for review because it was counted from symbols, not from a schedule.

“Confirmed” means two independent readings of the sheet gave the same quantity within 5%. “Review” means the readings disagreed or the count was visual, so the item stays in front of you with a note instead of being hidden.

How the takeoff path works

  1. Open the fileA full PDF up to 25 MB and 40 sheets, or DWG, DXF, IFC and images. The sheets open in the program directly, and DWG is converted on your computer.
  2. Know the cost before you startThe server splits the sheets into stages and shows the maximum number of points before a single point is charged.
  3. Two independent readings of each stageThe sheets are read twice, separately, then the two results are merged: agreement raises confidence, and disagreement is marked “Review”.
  4. Review on the sheet and hand over to pricingEvery item carries its sheet, its position and its calculation basis. Approve or edit, then export the bill of quantities or hand it to the pricing path to produce a PDF and Excel quotation with your logo.

How it differs from manual takeoff and foreign tools

KamyeklafManual takeoffForeign tools with human review
Time to resultMinutes per stageHours to daysUp to 24 hours
Language and pricesArabic, Saudi market prices with their sourcesDepends on the engineer’s experienceEnglish, no local prices
TransparencyA calculation basis for every item, and “Review” items visibleIn the engineer’s headA final result after a review you do not see
PaymentPoints reserved and charged when the stage completes, refunded if it failsSalary or feesSubscription with a limited number of takeoffs per sheet
Your dataThe file is deleted from the server after the job; the project is encrypted on your computerOn the engineer’s computerStored with the provider outside the Kingdom

What we do not say: we do not promise a fixed accuracy rate. Accuracy varies with how complete the sheets are and how clear their dimensions are, which is why every number stays in front of you with its basis.

Work out what you save each month, with your own numbers

The calculator does not know your office, so enter your own figures. The result is computed on your device and nothing is sent. The program time per project comes from the tests above; the review time is your estimate.

Hours saved per month27 hours
Their value at the engineer's cost1,215 SAR
The plan that covers itFreelancer · 199 SAR per month
Net per month after the subscription1,016 SAR

Program time is taken as half an hour per project from the villa (31 minutes) and retail-store (22 minutes) tests, and the plan is chosen at about 120 points per project from the same two tests. Internal test results, not a guarantee; prices before VAT.

Plans in brief

Freelancer

199 SAR per month

300 points a month on one computer. Enough for two to three villa takeoffs a month, or dozens of bills of quantities.

Office

599 SAR per month

800 points on two computers for two users with a shared balance, and quotations with your company logo.

Company

1,599 SAR per month

3,000 points on five computers for five users, and market prices for fifty thousand items a month.

Prices before 15% VAT, with up to 25% off for annual payment, and extra point packs when needed. The second path uses points only for what goes through AI: reading a PDF bill of quantities, importing supplier quotes from PDF and images, and estimating market prices. For companies with more than five users or with branches: a custom quote at info@kamyeklaf.sa.

Practical take-off guides

Quantity take-off from drawings step by stepThe order, the units and the deduction rules, with a worked example and a measurement record.
The ten costliest take-off mistakesHow to review a bill of quantities in ten minutes before approving it.
Take-off directly from a DWG fileWhy quantities get lost in conversion to PDF and how to avoid it.

Questions contractors ask

How is it different from online BOQ-pricing platforms?

Those platforms take a ready Excel bill of quantities and return it priced at their own rates, and you learn the file’s cost only after uploading it. KAM Estimator starts earlier: it measures quantities from the DWG, PDF or IFC drawing on your device, then prices them from your library, Saudi market rates and your subcontractors’ prices, and issues the quotation with your logo. If the BOQ reaches you ready, you open it in the program and start at pricing. The cost of every operation is stated before you start, and your project stays on your device.

Do I need both paths?

No. It is one program and one subscription, and each path has its own menu and projects. An engineering office that receives the bill of quantities ready-made works in the pricing path alone, and a contractor who starts from the drawings works in takeoff and then hands the project over to pricing with one button.

Can I trust the quantity without reviewing it?

No, and we do not ask you to. The program separates a “Confirmed” item, established by two independent readings, from a “Review” item, and writes the calculation basis for every item. Review what is flagged, and approve the rest after a glance.

Where do my drawings go?

The stage pages are sent to the AI service providers for processing, then the file is deleted from our server when the job ends, and we do not keep drawings in your account. Your project, prices and catalogue stay encrypted on your computer. Details in the privacy policy and security and trust page.

What if a stage fails or I run out of points?

Points are reserved when a stage starts and charged only when it completes. A failed stage gets its points back and can be rerun on its own, and completed stages are not lost.

Does the program work offline?

Opening drawings, drawing, manual takeoff on the plan and pricing from your catalogue work on your computer. AI reading and market prices need a connection to the server.

Need an answer before you decide?

Ask about the plans, or try a file from one of your projects with us before subscribing.