Contractor quotation template with a bill of quantities: what it must contain, and a ready template

A good quotation is a document of three layers: a header that states who is offering, to whom, for which project and against which reference; a priced bill of quantities with numbered items, each with a unit, a quantity, a unit price and a total; and a footer that states what the offer includes and excludes, its validity, and the payment, execution and warranty terms, with VAT on a separate line. Any of these elements that is missing turns into a dispute later. At the end of the guide is an Excel template that contains all of this ready to fill in.

Why one offer is rejected and another accepted at the same price

The owner or engineering office comparing three offers does not compare the grand totals first; they ask: do I understand what I will get for this figure? A one-page offer with a total figure and "everything included" reads as vagueness that hides later additions. An offer with numbered items, clear units and an explicit list of exclusions reads as a contractor who knows what they are doing. The items also protect the contractor: when the owner asks for a change, the basis for the additional pricing already exists in the original offer.

Layer one: the header

ElementWhy
Contractor's name and legal formCompany or sole establishment; the liability differs
Commercial registrationProves the activity is contracting and that it is active
Tax number (15 digits)Required for any invoice that will follow the quotation, and its presence reassures the client that tax will be charged lawfully
Address, phone and emailAn official channel for correspondence
Quotation number and dateA reference for every later correspondence, and for the quotation's versions if it is amended
Quotation validityUsually 15 to 30 days, because steel and concrete prices change
Submitted toThe owner's or entity's name, and its representative if any
Project and locationThe project name, the city, and the plot or plan number
Reference to the drawings and bill of quantitiesThe drawing number and its date or revision; a change in the drawings after the quotation changes the price, and this line is your evidence

Layer two: the priced bill of quantities

The mandatory columns are seven: item number, description, unit, quantity, unit price, total, and notes.

Description States the specification the price depends on: "reinforced concrete for slabs, grade 300, including reinforcement and formwork", not "concrete". Unit Is the one customary in the market, as in the quantity take-off guide: the cubic metre for concrete, the square metre for blockwork, plaster, flooring and paint, the linear metre for skirting, and count for doors. Quantity From your take-off or from the client's bill, with the source stated in the notes. Unit price Is the last layer of unit-rate analysis: direct and indirect cost and profit, without tax. The total A formula, not a hand-written figure, so the column sums never differ from the grand total.

Order the items in the order of execution: excavation and foundations, frame, masonry, plaster and insulation, floors, ceilings and paint, doors and windows, plumbing and electrical, then external works. The client who knows construction expects this order, and the client who does not understands it.

Below the table, three lines, not four and not one: Total before tax, VAT 15%, Total including tax. Merging tax into the unit prices makes your offer look more expensive than a competitor's that wrote it separately, and confuses the accountant at invoicing.

Layer three: the footer

The ready template

Download the Excel quotation template (one sheet, right to left). It contains the header with the nine elements, the items table with its seven columns and five example items, the formulas for the total, tax and grand total, and the terms lines. Fill in the fields in square brackets, delete or edit the example items, and do not type the totals by hand, as they are formulas.

What the template does not do: it does not save your prices from one quotation to the next, does not record where every price came from and when, does not stop the client from seeing the cost column if you add it on the same sheet, and does not track the quotation's versions when the client asks for a change. These four are what separate a template from software.

The same thing on screen

In the pricing path of KAM Estimator desktop app in the published release, the quotation comes out of the priced bill of quantities itself:

  1. Your company details and logo are saved once on your computer, encrypted, and appear in the header of every quotation.
  2. The items come from the bill of quantities you imported or took off, with their columns, and are not copied by hand.
  3. Pricing From your library, your suppliers' offers or Saudi market prices with their sources, and the source and date of every price stay in the project with you.
  4. The quotation as PDF and Excel with your logo shows the unit price and total only; the cost and profit column is not shown to the client.
  5. Versions and follow-up: every change the client asks for issues a numbered version saved alongside the previous one, and you track the quotation's status.
  6. Template designer: arrange the header, footer and terms as you want, so your quotations keep one look.
  7. Saving prices to your library when the quotation is issued, so the next quotation for a similar project is faster.

Checklist before sending

References

  1. Zakat, Tax and Customs Authority: e-invoicing · Tax invoice requirements, to clarify that a quotation is not an invoice, checked

FAQ

Is a quotation a tax invoice?No. The quotation is a pricing document before the contract, and the tax invoice is issued after the contract when payment falls due, according to the requirements of the Zakat, Tax and Customs Authority. Showing the tax number on the quotation signals that the invoice will be compliant, but it does not make the quotation an invoice.
Do I write VAT inside the item price or separately?Separately, on its own line after the total. That is what lets the client compare offers on one basis and matches what you will issue on the invoice.
How long is a contracting quotation valid?Commonly 15 to 30 days, less in periods when steel and concrete prices fluctuate. Tie the validity to the quotation date, not the sending date.
What do I write under "not included"?Everything the client might assume is within the price but is not: design and supervision, permits and insurance, utility connections, furniture and appliances, works not shown on the drawings, and changes after approval.
Do I show the unit price or only the total?Both, for every item. The unit price is what is settled on when quantities increase or decrease during execution, and its absence means a new negotiation over every change.
How do I handle items in the client's bill that I cannot price?Keep the item in the bill, write "not priced" in its price with a reason in the notes, and list it under exclusions. Deleting the item makes the client think it is within the price.
Is the template enough or do I need software?The template is enough for one or two quotations a month. When quotations become frequent and you need prices saved with their sources, versions, and hiding cost from the client, software becomes faster and less error-prone.

The template and the app

Download the template, and if you want the quotation to come straight out of the bill of quantities with your logo, try the pricing path for 14 days with no card.

Download the Excel quotation templateThe pricing path in the app

This guide was published on . The prices mentioned are examples from published references with their dates, not a quotation.